Employment impact assessment of Luangwa-Mwami Road, Zambia, using LFS and GIS
This publication presents a second Employment Impact Assessment (EmpIA) of Phase 2 of the Nacala Road Corridor Project (NRCP) in Zambia, undertaken by the ILO in collaboration with the African Development Bank (AfDB) and co-funded by the European Union.
This publication presents a second Employment Impact Assessment (EmpIA) of Phase 2 of the Nacala Road Corridor Project (NRCP) in Zambia, undertaken by the ILO in collaboration with the African Development Bank (AfDB) and co-funded by the European Union.
Building on the previous EmpIA that used satellite-based nighttime lights (NTL) to estimate employment effects, this study applies Labour Force Survey (LFS) data to further break down employment effects and applies Geographic Information Systems (GIS) to measure access to social infrastructure along the Luangwa–Mwami section of the corridor.
The report demonstrates how integrating official labour data with spatial methods can enhance the understanding of the employment and social outcomes of major transport investments, and provides guidance for future applications of the EmpIA approach.
Additional details
Author(s)
- Alina Game, Winfred Dotse-Gborgbortsi and Anna Roeland
References
- DOI: https://doi.org/10.54394/WKJT9306
- ISBN Web PDF: 9789220426678
Related content
STRENGTHEN2
Employment impact assessment to maximize job creation in Africa
Employment Impact Assessment
Topic portal
Employment-intensive investment
Relevant projects
METI Project
Mainstreaming Employment into Trade and Investment in the Southern Mediterranean
STRENGTHEN2
Employment impact assessment to maximize job creation in Africa