Background document of the Assessing the Cost of a Social Protection Floor in Mongolia: Introduction of Final Results And Draft Report
This is the background note for Assessing the Cost of a Social Protection Floor in Mongolia: Introduction of Final Results And Draft Report to be held in Puma Imperial Hotel, Ulaanbaatar, Mongolia on 12 September 2014.
Resource details
Date of publication
11 September 2014
Files for download
PDF 359.13 KB