ID (ISN) del documento | 110907 |
Número CIS |
10-0572 |
ISSN - Título de la serie |
0925-7535 - Safety Science |
Año |
2010 |
Número de serie |
|
Autor(es) |
Ghasemi E., Shahriar K., Sharifzadeh M. |
Título |
A new method for risk assessment of pillar recovery operation |
Información bibliográfica |
Dec. 2010, Vol.48, No.10, p.1304-1312. Illus. 24 ref. |
Resumen |
Safe pillar recovery operations can result in better miner safety and more efficient recovery of ore reserves. The most important technical parameters influencing the safety of pillar recovery are reviewed. A method for assessing the overall risk of pillar recovery operations in pre-developed room and pillar mines, by combining all these parameters, is described and applied to a mine in Iran. |
Descriptores (primarios) |
explotación minera en el fondo; valoración del riesgo; técnicas de seguridad; mineria del carbón |
Descriptores (secundarios) |
Irán, República Islámica del; descripción del procedimiento |
Tipo de documento |
D - Artículos periódicos |
Tema(s) |
Minas y canteras
|
Broad subject area(s) |
Riesgos mecánicos, transporte
|
Navegación por categoria(s) |
Mining and quarrying Risk evaluation
|