ILO Home
Volver a la página de entrada
Site map | Contact us English | Français

Base de datos CISDOC

ID (ISN) del documento108166
Número CIS 08-706
Año 2006
Número de serie HSE Research Report 447
Autor(es) Block M.
Health and Safety Executive
Título Fast rescue craft recovery by installation crane: Phase 2 study
Información bibliográfica HSE Books, P.O. Box 1999, Sudbury, Suffolk CO10 2WA, United Kingdom, 2006. viii, 15p.
Acceso Internet http://www.hse.gov.uk/research/rrpdf/rr447.pdf [en inglés]
Resumen This project is a continuation of a previous study which reviewed the possibility of using existing offshore pedestal type cranes for the launch and recovery of fast rescue craft. The earlier study concentrated mainly on the environmental and operational problems associated with launch and recovery of the craft. One concept studied was the permanent stationing of a fast rescue craft on a fixed offshore installation that could be launched and recovered by the platform cranes for emergency rescue and other forms of installation support. The present study focuses in more detail on the issue of the suitability of existing pedestal cranes on fixed installations to safely launch and recover fast rescue craft.
Descriptores (primarios) grúas; extracción de petróleo en el mar; botes de salvamento; socorro y salvamento
Descriptores (secundarios) técnicas de seguridad; informe; Reino Unido
Tipo de documento E - Libros, informes, actas
País / Estado o ProvinciaReino Unido
Tema(s) Minas y canteras
Broad subject area(s) Riesgos mecánicos, transporte
Navegación por categoria(s) Cranes
Petroleum and natural gas industry