ILO Home
Go to the home page
Site map | Contact us Français | Español

CISDOC database

Document ID (ISN)78027
CIS number 02-385
ISBN(s) 0-7176-2090-5
Year 2001
Convention or series no. HSE Contract Research Report CRR 363/2001
Author(s) Wintle J.B., Kenzie B.W., Amphlett G.J., Smalley S.
Health and Safety Executive
Title Best practice for risk based inspection as a part of plant integrity management
Bibliographic information HSE Books, P.O. Box 1999, Sudbury, Suffolk CO10 2WA, United Kingdom, Sep. 2001. viii, 114p. Illus. Bibl.ref. Price: GBP 30.00.
Abstract This report discusses the best practice for the application of Risk Based Inspection (RBI) for the inspection of pressure equipment and systems that are subject to the requirements for in-service examination under the Pressure Systems Safety Regulations 2000 (PSSR). It can also apply to equipment and systems containing hazardous materials that are inspected as a means to comply with the Control of Major Accident Hazards Regulations (COMAH, see CIS 00-24). The report considers the application, data requirements, team competences, inspection plan (including NDT techniques and reliability) and overall management of the RBI process. An audit tool is given in the Appendices order to assist the evaluation the RBI process. This contains a flow diagram followed by a series of questions and a commentary relating to each stage, outlining the proposed best practice.
Descriptors (primary) dangerous substances; safety checks; pressure vessels and systems
Descriptors (secondary) United Kingdom; legal aspects; non-destructive testing; reliability; safety audits; report
Document type E - Books, reports, proceedings
Country / State or ProvinceUnited Kingdom
Subject(s) Pressure vessels and systems
Broad subject area(s) Fires, explosions and major hazards
Browse category(ies) Compressed gases and pressure vessels
Safety supervision