ILO Home
Go to the home page
Site map | Contact us Français | Español

CISDOC database

Document ID (ISN)44478
CIS number 85-1205
ISSN - Serial title 0373-1944 - Travail et sécurité
Year 1984
Convention or series no.
Author(s) Meyer J.P., Didry G., Horwat F.
Title Access to tower cranes
Original title Accès des grues à tour [in French]
Bibliographic information Dec. 1984, No.12, p.639-645. Illus. 6 ref.
Abstract Aims of this study: 1. To determine the strain imposed on the heart of workers climbing tower crane masts and 2. To observe the influence of this strain on the working capacities of the crane operator, particularly when assuming control and during the first manoeuvres. The heart rate of 17 crane operators was subjected to continuous measurement by telemetry and recorded on magnetic tape during 3 types of physical exercise. Conclusion: climbing ladders to a height of >20m produces great physical strain and a heart rate well over the permitted maximum of 145 contractions/min. There was no effect however on working capacity. Practical advice is given on how to reduce the strain on the heart of the workers and recommendations on how workers should climb up to or descend from the control cabins.
Descriptors (primary) access to workplaces; physical workload; tower cranes; work at height; work capacity
Descriptors (secondary) pulse rate
Document type D - Periodical articles
Subject(s) Materials handling and storage
Broad subject area(s)
Browse category(ies) Cranes