Document ID (ISN) | 108832 |
CIS number |
08-1444 |
ISSN - Serial title |
1287-7778 - Prévention BTP |
Year |
2008 |
Convention or series no. |
|
Author(s) |
Sagot F. |
Title |
Construction site cranes - Optimizing preparation before commissioning |
Original title |
Grue de chantier - Optimiser la préparation avant la mise en service [in French] |
Bibliographic information |
Apr. 2008, No.106, p.34-35. Illus. |
Abstract |
This article addresses regulatory checks that need to be made prior to signing-off the operation of cranes on construction sites. They include in particular checks during erection and verifications that the equipment is suited to its expected use. In cases where the crane encroaches on public land, the enterprise must obtain local authority permission. In all cases, it is essential to consult the manufacturer's documentation and to comply with its requirements. Topics: overhead power cables; taking the effect of wind into account; electronic safety systems; cabins; training and information of crane operators by construction site managers. |
Descriptors (primary) |
legal aspects; France; construction sites; safety checks; construction industry; plant safety organization; tower cranes |
Descriptors (secondary) |
safety devices; wind; crane cabins; overhead electric lines; information of personnel; role of government; safety training in industry; role of management; hazard evaluation |
Document type |
D - Periodical articles |
Country / State or Province | France |
Subject(s) |
Construction industry
|
Broad subject area(s) |
Mechanical hazards, transport
|
Browse category(ies) |
Safety supervision Cranes Construction industry and civil engineering
|