|
|
Unit Aims, Objectives and Prerequisites
S.2.2. Supervision of container terminal quay transfer operations
1. Unit Aims
This Unit is designed:
- To explain how the quay transfer operation is supervised and controlled.
- To describe how the quay transfer supervisory and control staff prepare for,
take over and begin work.
- To discuss the documentary and other procedures relating to shift change-over,
completion and review of the quay transfer operation.
- To review the role of the supervisor in the quay transfer operation.
- To improve the quality of supervision of the quay transfer operation.
- To provide the knowledge and skills necessary to review critically current
supervisory procedures and mechanisms.
2. Unit Objectives
After completing this Unit, the learner will be able to:
- State the three basic requirements of a control and supervision system for
quay transfer, and describe how those requirements can be met.
- Name the personnel involved in the quay transfer operation and outline their
main duties.
- Describe the planning and preparation activities prior to start-up of quay
transfer activities for a shift.
- Outline the steps taken at operations start-up or handover, when the crane
controllers and the supervisor prepare to begin work.
- Describe the systems available for the control of quay transfer movements
for inbound containers, and compare the effectiveness and efficiency of radio-,
computer- and document-based systems.
- Describe the systems available for the control of quay transfer movements
for outbound containers, and compare the effectiveness and efficiency of radio-,
computer- and document-based systems.
- Outline and explain the significance of the procedural steps followed when
responsibility for and authority over quay transfer activities are handed from
one shift to another.
- Describe the documentary and other procedures required for the orderly completion
and review of an operation.
- List and describe the six aspects of responsibility of the supervisor of the
quay transfer operation.
- Define, recognize the best definition of, or distinguish between true and
false statements concerning, the technical terms used in the Unit, as listed in
sections 3 and 4 below.
3. Unit Prerequisites
It is assumed that, before starting this Unit, trainees will have completed
successfully the following Units or will have demonstrated (eg by successfully
completing the Tests for those Units) their understanding of the topics covered
by them:
- Container terminal operations (C.1.1)
- The container terminal quay transfer operation (C.1.3)
- The container yard operation (C.1.4)
- Container terminal work schedules (C.2.4)
- Container numbering and marking (C.3.2)
- Safe working on container terminals (C.4.1)
- Handling dangerous cargoes in ports (P.3.1)
- Supervising container ship discharge and loading (S.2.1)
|